Flash: LNG Signals positive FID for CCL3 in 1H2018 with Bechtel EPC contract

On Monday, December 18, 2017, Cheniere announced that it signed an approximately $2.36B fixed-price turnkey Engineering, Procurement and Construction (EPC) contract with Bechtel Oil, Gas and Chemical, Inc. (Bechtel) to proceed with the construction of Corpus Christi Train 3 (CCL3), a 4.5MM Metric Ton per Annum (MM MTPA) or about 576MMCF/Day LNG liquefaction facility, by July 5, 2018

Continue Reading →